BREACH (1)
BREACH EXISTING BERM (2)
LOG JAM (3)
| ENGINEERED LOG JAM |
| SINGLE |
| FIVE LOG CLUSTER |
UPSTREAM LARGE WOODY DEBRIS (4)
GEOTECHNICAL EXPLORATION (5)
SURVEY NEEDS (6)
CONSTRUCTION CHANNEL INLET and OUTLET (7)
SIDE CHANNEL (8)
RESTORED WETLANDS (9)
WETLAND EMBANKMENT (10)
CONFLUENCE LEVEE REMOVAL (11)
WDNR (12)
UNECONOMIC REMNANT (13)
PERMANENT ROAD EASEMENT (14)
TEMP WORK AREA EASEMENT (15)
TEMP CONST EASEMENT (16)
CHANNEL IMPROVEMENT EASEMENT (17)
PERPETUAL FLOWAGE EASEMENT (18)
FEE (19)
ROE Parcels (20)
|